1-7 Livonia Street W1

  • Address

    1-7 Livonia Street
  • Size

    14,500 sq ft
  • Timing

    N/A

Located just off Broadwick & Berwick Street, 1-7 Livonia Street was originally constructed in the 1960’s and comprises 14,500 sq ft of office accommodation. The building provides highly attractive floor plates and is currently single let to a post-production studio.

The building sits within Sterling’s long-term portfolio.

10-16 Bevis Marks EC3

  • Address

    10-16 Bevis Marks, EC3
  • Size

    18,000 sq ft
  • Timing

    2025

Situated in the heart of the City of London, 10-16 Bevis Marks is a vacant office building comprising 18,000 sq ft. Working alongside a best-in-class professional team led by AHHM Architects, Sterling has achieved planning permission for development of an additional storey and conversion to C1 use offering 24 apartments for a design conscious low carbon scheme in keeping with the sensitivities of the immediate locality.

22 Vine Hill EC1

  • Address

    22 Vine Hill, Farringdon EC1
  • Size

    23,000 Sq Ft
  • Timing

    2024

We completed the purchase of three neighboring buildings, 22-26 Vine Hill, 7 Warner Yard and 14 Rosebery Avenue in 2020 and we worked with Buckley Grey Yeoman architects and our project team to combine all three existing buildings to create a 23,000 Sq Ft self-contained office building. The building completed its refurbishment in May 2024 and benefits from an array of outstanding architectural features, exceptional volume and a private courtyard.

Camden Assembly NW1

  • Address

    Camden Assembly, 49 Chalk Farm Road NW1
  • Size

    6,000 Sq Ft
  • Timing

    Current

Iconic live music and drinking venue in the heart of Camden. The building is single let with long term income.

Charterhouse Street EC1

  • Address

    38 & 40-42 Charterhouse Street, Farringdon EC1
  • Size

    10,000 Sq Ft
  • Timing

    2023

Located directly opposite Farringdon Station’s Crossrail entrance, in one of London’s most sought-after commercial districts, we worked closely alongside Stiff + Trevillion Architects and our project team to reposition both buildings. The refurbishments completed in Q3 2023 and are incoming producing.